WEBVTT

00:04.440 --> 00:06.662
One of the first steps in the refueling

00:06.662 --> 00:08.718
process involves removing the usable

00:08.718 --> 00:10.940
fuel from the fuel tanks with each tank

00:10.940 --> 00:13.107
standing 250 ft tall and 100 ft wide .

00:13.739 --> 00:15.850
The usable fuel will be removed using

00:15.850 --> 00:17.572
gravity through the fuel lines

00:17.572 --> 00:19.739
connected to the lower portion of each

00:19.739 --> 00:21.795
tank down to the 10 ft level . After

00:21.795 --> 00:24.017
leaving the tanks , fuel will flow down

00:24.017 --> 00:26.128
three miles of pipeline from Red Hill

00:26.128 --> 00:28.072
to a fueling pier where it will be

00:28.072 --> 00:30.350
loaded onto cargo ships for relocation .

00:32.479 --> 00:34.646
It will take approximately 52 hours to

00:34.646 --> 00:35.529
fill each tanker .