WEBVTT

00:07.440 --> 00:10.620
So our core dam safety program

00:10.630 --> 00:12.950
involves a lot of different aspects .

00:13.110 --> 00:16.240
I'll see . There are a lot of tasks

00:16.240 --> 00:18.020
which are repeated annually and

00:18.020 --> 00:20.650
concurring on an ongoing . Those would

00:20.650 --> 00:22.840
involve things like the reading of

00:22.840 --> 00:24.507
instrumentation at our dams ,

00:24.507 --> 00:26.507
monitoring the health of our dams ,

00:26.507 --> 00:28.520
doing reports associated with that

00:28.610 --> 00:31.160
performing inspections , both annual

00:31.160 --> 00:33.020
inspections and more detailed

00:33.020 --> 00:35.590
inspections on a less frequent basis .

00:36.070 --> 00:38.292
So we have inspection program , we have

00:38.292 --> 00:40.126
a monitoring and instrumentation

00:40.126 --> 00:43.380
program . Uh We also have a robust

00:43.390 --> 00:45.650
design and construction program to

00:45.660 --> 00:48.910
improve and rehabilitate things that

00:48.920 --> 00:51.160
get older and deteriorated our dams .

00:51.750 --> 00:53.639
And then there was a lot of other

00:53.639 --> 00:57.300
things like we do emergency Action plan

00:57.310 --> 00:59.532
preparation or water management Group ,

00:59.532 --> 01:01.699
does a lot of that and we're with them

01:01.699 --> 01:03.921
in Geo Tech branch . So that's all down

01:03.921 --> 01:06.143
safety , making sure we have plans that

01:06.143 --> 01:08.254
should something go wrong at a dam or

01:08.254 --> 01:10.199
even if not something is not going

01:10.199 --> 01:12.366
wrong if we have spillway flow , which

01:12.366 --> 01:14.588
is the proper performance of a , but it

01:14.588 --> 01:16.643
releases a lot of water downstream .

01:16.643 --> 01:18.810
How we would notify people who to call

01:18.810 --> 01:20.921
uh and work with downstream emergency

01:20.921 --> 01:22.921
responders and emergency management

01:22.921 --> 01:24.977
office preparing those plans , doing

01:24.977 --> 01:27.032
exercises to go through with our dam

01:27.032 --> 01:28.921
operators and all those different

01:28.921 --> 01:31.088
organizations , both core and external

01:31.088 --> 01:33.254
of the core as to how we would respond

01:33.254 --> 01:35.820
in a situation . Uh We were involved a

01:35.820 --> 01:38.153
lot with that in the dam safety program .

01:38.153 --> 01:41.220
And then there's just a lots of other

01:41.220 --> 01:43.980
things that prop up . We do uh pretty

01:43.980 --> 01:46.460
robust risk studies on a periodic basis

01:46.460 --> 01:48.930
for dance as well , reassessing the

01:48.930 --> 01:50.708
health of the dam , making sure

01:50.708 --> 01:52.374
something hasn't changed that

01:52.374 --> 01:54.760
jeopardizes the public in a different

01:54.760 --> 01:56.982
way due to new development downstream .

01:56.982 --> 01:58.760
Those sorts of things . So that

01:58.760 --> 02:00.427
involves a lot of engineering

02:00.427 --> 02:02.593
assessment as well as getting products

02:02.593 --> 02:04.970
from certain agencies or certain

02:04.970 --> 02:07.026
organizations within the core of the

02:07.026 --> 02:08.859
support that , such as new flood

02:08.859 --> 02:10.803
mapping and inundation mapping and

02:10.803 --> 02:13.026
consequence analysis downstream for the

02:13.026 --> 02:14.859
public , that sort of thing . So

02:14.859 --> 02:17.081
there's a lot of missions of dam safety

02:17.081 --> 02:20.680
pretty widespread . We have 15

02:20.680 --> 02:24.600
dams that we take care of . Ah so

02:24.600 --> 02:26.267
we have what we call periodic

02:26.267 --> 02:28.211
inspections on a five year basis .

02:28.211 --> 02:30.211
Those periodic inspections are very

02:30.211 --> 02:32.170
robust inspections which include

02:32.180 --> 02:34.770
geotechnical engineers , geologists ,

02:34.780 --> 02:37.430
structural mechanical electrical

02:37.430 --> 02:39.597
engineers . We look at all the systems

02:39.597 --> 02:41.763
in the dams , we go up tunnels , we go

02:41.763 --> 02:43.930
in towers , we look at everything . So

02:43.930 --> 02:46.880
uh those form the basis of identifying

02:46.880 --> 02:49.460
any deterioration or issues at the dam

02:49.940 --> 02:53.750
that require upgrades or construction

02:53.750 --> 02:55.900
or measures to address and make sure

02:55.900 --> 02:58.680
the dam is staying and it's originally

02:58.680 --> 03:02.050
intended condition to be in great shape

03:02.060 --> 03:04.810
and perform as expected . So , those

03:04.810 --> 03:07.032
periodic inspections are really the key

03:07.032 --> 03:09.088
to that , to addressing those issues

03:09.088 --> 03:11.199
and they inform our budgeting process

03:11.199 --> 03:13.532
and what projects come along to do that .

03:13.532 --> 03:15.254
Uh And of course we assess our

03:15.254 --> 03:17.588
instrumentation and all as part of that .

03:17.588 --> 03:19.980
Uh The in addition to those five year

03:19.980 --> 03:22.470
inspections , we also come to all of

03:22.470 --> 03:25.730
the dams and really , uh again each

03:25.730 --> 03:27.841
year we're only going to a handful of

03:27.841 --> 03:29.730
dams for those five year detailed

03:29.730 --> 03:31.952
inspections , but then we also come out

03:31.952 --> 03:34.174
and we walk the dams fully , especially

03:34.174 --> 03:37.150
the embankments on an annual basis ,

03:37.150 --> 03:39.261
and coordinate with the dam operators

03:39.261 --> 03:41.317
during those trips , take instrument

03:41.317 --> 03:43.430
readings , just look whether anything

03:43.430 --> 03:46.010
is out of the ordinary . Talk to the

03:46.010 --> 03:48.232
dam operators about what they're seeing

03:48.232 --> 03:50.399
every day for our five year . Periodic

03:50.399 --> 03:53.170
inspections takes about a day , but

03:53.170 --> 03:55.226
there's there's months worth of work

03:55.540 --> 03:57.651
beyond that , in both the preparation

03:57.651 --> 04:00.330
and coordination in advance . And we

04:00.330 --> 04:03.120
write very thorough quality , robust

04:03.120 --> 04:05.560
reports after that . Uh And that takes

04:05.560 --> 04:07.380
weeks and weeks of effort and

04:07.380 --> 04:09.380
preparation for those reporting and

04:09.380 --> 04:11.269
reviews , uh and how we track the

04:11.269 --> 04:13.491
recommendations that come out of that .

04:13.491 --> 04:15.720
So for our annual inspections that are

04:15.720 --> 04:18.390
more JIA , technically based that we do

04:18.390 --> 04:20.600
it all of our dams that usually

04:20.600 --> 04:23.960
involves , I would say

04:23.970 --> 04:27.380
2-4 people that would come out on an

04:27.380 --> 04:29.440
annual basis and walk with the dam

04:29.440 --> 04:31.700
operators do inspections and

04:31.740 --> 04:33.830
documenting site visit reports what

04:33.830 --> 04:34.830
we're seeing .

04:37.840 --> 04:41.660
Mhm . Yeah . Mhm . Mhm .

04:42.140 --> 04:45.740
Yeah . Yeah . Mhm . Yeah .

04:47.040 --> 04:50.740
Yeah . Yeah . Yeah .

04:52.640 --> 04:53.640
Yeah .

05:02.540 --> 05:05.960
Yeah . Yeah . Yeah .