WEBVTT

00:00.140 --> 00:03.790
the very first real world load

00:03.790 --> 00:06.760
test of the next generation P 19 see

00:06.770 --> 00:08.881
aircraft rescue and firefighting fire

00:08.881 --> 00:12.230
trucks into a C 1 30 aircraft is a hold

00:12.230 --> 00:14.290
your breath kind of moment . You see

00:14.290 --> 00:16.234
that from a distance ? You see the

00:16.234 --> 00:18.401
truck . You're kind of like , Well , I

00:18.401 --> 00:18.180
don't know if that's gonna fit ,

00:18.190 --> 00:20.523
especially for Air Force civil engineer ,

00:20.523 --> 00:22.523
center Fire and Emergency Service's

00:22.523 --> 00:24.801
fire truck program manager Fred Terran ,

00:24.801 --> 00:26.801
who's been leading this $29 million

00:26.801 --> 00:28.968
fleet replenishment mission from start

00:28.968 --> 00:31.190
to finish for the past four years . You

00:31.190 --> 00:33.246
have to meet a certain requirement ,

00:33.246 --> 00:35.412
dimensions , length , width and height

00:35.412 --> 00:37.412
inside that aircraft . We give that

00:37.412 --> 00:39.634
onto the manufacturers for the build of

00:39.634 --> 00:41.357
this truck . This is the first

00:41.357 --> 00:43.412
reengineer design and production for

00:43.412 --> 00:45.579
these trucks in nearly four decades is

00:45.579 --> 00:47.523
replacing the original 19 eighties

00:47.523 --> 00:49.301
model . These air transportable

00:49.301 --> 00:51.412
aircraft rescue and firefighting , or

00:51.412 --> 00:53.246
are fire trucks can be delivered

00:53.246 --> 00:55.412
anywhere in the world if they fit . So

00:55.412 --> 00:57.357
this load test , both backward and

00:57.357 --> 00:59.357
forward at the Savannah Georgia Air

00:59.357 --> 01:01.190
National Guard base , verified a

01:01.190 --> 01:03.190
successful mission . We took a real

01:03.190 --> 01:05.357
nice and easy and slow , and it fit on

01:05.357 --> 01:07.468
the aircraft just like a glove on the

01:07.468 --> 01:09.634
hand . The prototype desert deployable

01:09.634 --> 01:11.857
fire truck we loaded it didn't have any

01:11.857 --> 01:13.912
hiccups . The mirrors were were told

01:13.912 --> 01:15.700
We're gonna be taken off and we

01:15.700 --> 01:17.867
actually rebel loaded with him on . So

01:17.867 --> 01:20.089
it's definitely a plus for downrange or

01:20.089 --> 01:22.089
easy offline . They have tohave gal

01:22.089 --> 01:24.089
image on the ground for aircraft to

01:24.089 --> 01:27.290
land so much water to put out if it was

01:27.290 --> 01:29.346
on fire . So that's why they have to

01:29.346 --> 01:31.679
bring these fire trucks in these trucks .

01:31.679 --> 01:33.901
Here they carry 1000 gallons , and once

01:33.901 --> 01:36.012
they got the county John , the Ground

01:36.012 --> 01:38.234
and other aircrafts could start landing

01:38.234 --> 01:40.457
and doing their operations . This truck

01:40.457 --> 01:42.860
can go on a C 17 and a C five , but two

01:42.860 --> 01:45.410
C 1 30 is the aircraft choice in

01:45.410 --> 01:47.632
theatre Over there , they can land that

01:47.632 --> 01:49.632
plane on May different surfaces and

01:49.632 --> 01:51.799
just offload this truck . This mission

01:51.799 --> 01:53.854
is just one of several ways that the

01:53.854 --> 01:55.799
Air Force installation and Mission

01:55.799 --> 01:57.577
Support Centers Air Force Civil

01:57.577 --> 01:59.632
Engineer Center is delivering robust

01:59.632 --> 02:01.743
combat support to enhanced warfighter

02:01.743 --> 02:03.743
readiness and lethal ality . We got

02:03.743 --> 02:05.688
something as common . Get that war

02:05.688 --> 02:07.743
fighter , what they need to do their

02:07.743 --> 02:09.910
mission for the Air Force installation

02:09.910 --> 02:12.077
and Mission support Center . I look at

02:12.077 --> 02:12.070
this is history . History was made

02:12.070 --> 02:14.070
today in the airport , and that's a

02:14.070 --> 02:15.400
good thing . I'm Brian God .

