I could have been a captain salinger

00:08.147 --> 00:12.374
for 37 of the airlift group andon the lead planner for cross

00:12.394 --> 00:13.060
reach 60

00:14.480 --> 00:19.700
chris reaches a formation exercisebetween 10 airlift wings from

00:19.700 --> 00:25.500
across air force our goal is to practiceproficiency and efficiency

00:25.877 --> 00:30.740
and executing a g r f global responseforce a type that scenario

00:31.025 --> 00:35.400
I roll is the overall lead plannerfor all air force assets so

00:35.600 --> 00:39.490
i'm attached with d a conflationbetween the fighter support

00:39.790 --> 00:44.450
the c two s are portioned j starsand the overall math train

00:44.480 --> 00:47.794
which is going to be c 17 xx andseven thirties of different

00:47.794 --> 00:53.850
varieties so overall this crossre 16 is a full exercise of the

00:53.850 --> 00:57.195
capabilities of joint base charlestonhas to offer so everything

00:57.200 --> 01:02.320
in front of the support and tracyare supporting agencies to

01:02.320 --> 01:06.790
launch out a large formation ofup to 15 aircraft all the way

01:06.790 --> 01:09.720
to the actual pilots among mastersor to the mission on the day

01:09.720 --> 01:14.390
of soe on the 20 fifth were annexedto exercise our soul to peace

01:14.570 --> 01:19.210
which is going to be a halo hyaltwo a low opening airdrop and

01:19.210 --> 01:22.650
then spread to some repaired runwayoperations into a dirt landing

01:22.650 --> 01:28.300
strip so as the 20 fifth on the 20sixth then we launch the mass

01:28.300 --> 01:32.840
foresight of john bish rawson and therewill be 11 aircraft departing

01:32.840 --> 01:38.010
here and landing at pope at that pointwe would tell me to ownership

01:38.060 --> 01:44.213
of aircraft so will have threec one 30 days and then 15 c 17

01:44.213 --> 01:49.325
xx followed by two c one 30 h'sI think the most rewarding part

01:49.330 --> 01:53.690
being the planner is sitting onthe ramp tennis before takeoff

01:54.060 --> 01:57.680
were you have all the aircraftengines running here 50 hunter

01:57.680 --> 02:01.100
third army soldiers in the backof the aircraft ready to jump

02:01.190 --> 02:04.540
in you have all the tension hasfinally hit a fever pitch and

02:04.540 --> 02:07.463
the planning is done and has timefor the operator stark skewed

02:08.140 --> 02:11.808
by executing this we actually findsmall things that we can prove

02:11.808 --> 02:15.761
one and then the next iterationwe makin' a point to correct

02:15.761 --> 02:18.826
this baker would you say

02:20.160 --> 02:24.140
so by suspending exercises we learnto speak the same language

02:24.140 --> 02:28.047
between the army and air forceso that in actual execution or

02:28.051 --> 02:30.500
timeline to be much tighter becausewe are speaking the same

02:30.500 --> 02:36.157
language so these are says are vitalto the proficiency and timeline

02:36.250 --> 02:39.880
that we can excuse what is thatwe haven't covered it is the

02:39.880 --> 02:43.780
joint this charleston integrationso a large part of this exercise

02:43.780 --> 02:47.800
is between the active duty in thereserve as the reservists will

02:47.800 --> 02:51.710
be providing an air medical evacuationscenario after the master

02:51.730 --> 02:56.170
drops will be sending two aircraftto mccall army airfield where

02:56.170 --> 03:01.540
they will be executing a simulatedcasually I back u s so that

03:01.540 --> 03:06.702
exercises all pieces of our missionset from air dropped or air

03:06.702 --> 03:11.632
land to air reservists who are ableto pursue their medical evacuation.