The U.S. army corps of engineersawful district.

00:41.640 --> 00:45.340
Like to talk to you about non structuralflood risk management measures.

00:46.530 --> 00:49.290
We'll stick were familiar withstructural for risk management

00:49.290 --> 00:52.650
measures which consist of thingssuch as Lebanese and flood walls

00:52.830 --> 00:57.560
diversion channel's retention structuresretention ponds measures.

00:57.560 --> 01:00.640
It physically change the environmentto manage flood risk.

01:01.650 --> 01:05.070
Now on structural flood risk managementmeasures reduced flood

01:05.070 --> 01:08.990
risk by modifying characteristicsof buildings and structures

01:09.240 --> 01:13.700
that are at risk of damage due toflooding and or by modifying

01:13.700 --> 01:17.750
practices of people living in orowning property in flood plains.

01:18.700 --> 01:21.660
When you talk about non structuralflood risk management measures.

01:22.180 --> 01:25.080
They're typically two mainnon structural measures.

01:25.810 --> 01:27.050
The first as relocation.

01:27.640 --> 01:29.210
The second is elevation.

01:30.500 --> 01:33.720
We location is one assistance istypically provided a home and

01:33.720 --> 01:37.170
business owners so they can relocateout of areas that have a

01:37.170 --> 01:38.230
high risk of light.

01:39.000 --> 01:42.170
That allows property owners to probablyrelocate on of the flood

01:42.170 --> 01:44.780
plain or flood way and reducetheir flood risk.

01:45.770 --> 01:49.150
After papua to locate the structureswill be removed from the

01:49.150 --> 01:50.240
flood away in flood plain.

01:51.030 --> 01:54.520
This role are water to flow throughan area that is why are able

01:54.520 --> 01:58.150
to accommodate higher fines ofwater increasing the capacity

01:58.150 --> 01:59.140
of the natural Street.

02:00.540 --> 02:03.830
The circuit non structural for riskmeasured measure is elevation.

02:05.090 --> 02:06.770
This is a typical house construction.

02:07.550 --> 02:09.400
The finish for the home is that great.

02:10.090 --> 02:14.200
During a fun event water inflow throughthe home causing damage.

02:15.320 --> 02:19.920
Elevation was the first for lolahome above the one% any what

02:19.920 --> 02:22.570
chance from all are onehundred year for all.

02:23.380 --> 02:25.500
This reduces the risk ofdamage due to flooding.

02:26.160 --> 02:29.080
The house is elevated. So floodwaterswill flow beneath that

02:29.080 --> 02:31.890
there's for mobile reducingthe risk of damages.

02:32.910 --> 02:36.470
That includes a discussion on non structuralflood risk management measures.

02:37.000 --> 02:37.340
Thank you..